G-Corp Residences

G-Corp Residences construction

G- Corp Residences

Salient Features of the Project:

• Block –A and Block-C -2 Basements, GF, 14 upper floors, Terrace floor, Overhead tank, lift machine room, staircase headroom, underground tank, STP tank, Swimming pool
• Block-B – 2 Basements, GF, 8 upper floors, terrace floor, Overhead tank, lift machine room, staircase head room, underground tank, and STP tank.

Project Details: Construction of residential apartments

  • Year of Completion
    January, 2017
  • Duration of Work
    14 Months
  • Project Cost
    80.03 Crore